EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
SpiritOfMudsuck
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (686)
Avionics
- (33)
Cockpit
- (33)
Controls
- (69)
Cowling
- (29)
Documents
- (5)
Empennage
- (105)
Engine
- (78)
Ext. Finish
- (34)
Firewall Forward
- (14)
Fuel System
- (6)
Fuselage
- (14)
Hangar
- (106)
-
Rent
-
Rent
-
Rent
-
Rent
-
Rent
-
Organize & Prep
-
Raw material hangers
-
Hang Lights
-
Rent
-
Rent
-
Air Compressor
-
Rent
-
Rent
-
Move Workbench
-
Organize Space
-
Pickup and Deliver...
-
Level Flooring
-
Spread rock floor
-
Add stone to floor
-
Remove Impediments
-
Monthly rent
-
Evaluate and Clean...
-
Monthly rent
-
Monthly rent
-
Prep cradle for...
-
Packing and prep for...
-
Additional work on...
-
Wing Cradle Inspection
-
Clean and Collect
-
More platform recovery
-
Lumber recycle
-
Disassemble last of...
-
Recover 2x6s
-
Packing up
-
Prep for Move
-
Clean and Pack
-
More organization...
-
Organize and store...
-
Pack and Move Parts
-
Clean Up, Organize,...
-
Cleanup prep for Paint
-
Yearly Hangar Rental
-
Reorganize Storage
-
Hangar Cleanup
-
Refuse disposal
-
Hangar rent Sep 2020...
-
Repair Canvas Tear
-
Repair Roof Leak
-
Tighten/replace...
-
Cleanup
-
Repair Door...
-
Drainage
-
Additional Work Light
-
Set Drain Line
-
Placed drainage pipe
-
Clear Drainage
-
Replace Canvas Door...
-
Repair Torn Grommets
-
Divert Rain Water...
-
Paint and Hang Sign
-
Layout Hangar Sign
-
Front Wall Sign/rent
-
Drainage Ditch
-
Illuminated Exit Sign
-
Seal Roof
-
Chemical Weeding
-
Brush Cutting
-
Door Maintenance
-
Door Repair, APRS
-
Door Repair
-
Sliding Hangar Door
-
Roof Maintenance
-
Drainage and...
-
Hang Shop Lights
-
Install Shop Lights
-
Wire Outlets, Hang...
-
Power Conduit
-
Platform,...
-
Canvas Door Hangers
-
Work Platform...
-
Prep for Work...
-
Door Lockset &...
-
Install Entry Door
-
Entry Door Framing
-
Soft Door Hanger
-
Side Door Prep
-
Hang Right Side Door
-
Canvas Door...
-
Right-side Hangar Door
-
Wiring & Curtain...
-
Interior Conduit...
-
Prep For Hagar Door...
-
Prep for AEP Power...
-
Electrical...
-
Electrical...
-
Electrical Inspection
-
Grounding, Place Outlet
-
Pull Service Wires...
-
Underlayment and...
-
Rehabilitate Roofing
-
Strip Metal Sheeting...
-
Electrical Power...
-
Electrical Power...
-
Build work platform
-
Clean hanger space
-
Evaluation &...
Interior Finish
- (6)
Instrument Panel
- (72)
Inspection
- (2)
Landing Gear
- (6)
Propeller
Radios
- (8)
Research
- (21)
Tools
- (11)
Wings
- (34)
Builder Name:
Pete Dailey
-
Project:
Sonex - Xenos-B Motorglider
-
VIEW REPORTS
Total Hours:
1506.3
Total Flight Time:
Total Expense:
$75148.03
Start/Last Date:
Jul 01, 2016 - No Finish Date
Engine:
Aerovee 2.1 Turbo
Propeller:
Sensenich
Panel:
MGL Avionics Explorer iEFIS/ECB/RDAC
Friendly URL:
https://eaabuilderslog.org?s=SpiritOfMudsuck
Home or Last Project Picture
Dec 04, 2022
Prep cradle for transport
- (1.5 hours)
Category: Hangar
Removed wings and set them on saw horses and covered with plastic. Examined cradle to determining if additional structure or support is necessary for transportation to new assembly building.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.